    Default More Modern? STS 3.1.0 vs STS 3.2.0.M2

    Hi.

    I'm new to STS and Eclipse.

    I installed what I thought was the latest, greatest STS:

    Spring Tool Suite 3.1.0.RELEASE - based on Eclipse Juno 4.2.1

    However, I went back to the download page to look something up and I found:

    Milestone Version - Spring Tool Suite 3.2.0.M2 - based on Eclipse Juno 4.2.2

    I take it that "M2" stands for "Milestone 2".

    Are "Milestone Versions", advanced releases not considered to be fully stable/fully test releases?


    Thank you in advance for any information

    Steve

  2. #2
    Join Date
    Mar 2007
    Posts
    128

    Default

    Yes. Usually "GA" or "RELEASE" are considered production. Milestones are mostly stable but not quite finished and just a step or two away from being considered the next release.

  3. #3
    Join Date
    Jan 2012
    Posts
    27

    Default

    Thank You for the help and the fast reply.

  4. #4
    Join Date
    Aug 2008
    Location
    Vancouver, BC
    Posts
    750

    Default

    Generally, our Milestone releases for STS are fairly stable and there are few problems with them. If you are having any issues with our latest GA release, then I would suggest a milestone release.
    Andrew Eisenberg, Ph.D.
    SpringSource, a division of VMware
    SpringSource Tools Team
    More about AJDT, Groovy-Eclipse, and Grails tooling

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •