Dec 7th, 2012, 02:58 AM
#1
increasing duration between steps over a long period
Dear all,
my job does some file analysis over a quite long period of time. There are ~1200 files to read and analyse.
Within the job specification, I do iteration over a set of 10 steps required to analyse a single file.
Now I am facing a increased duration on analyzing a file. At start a single iteration over 10 steps took ~ 10 seconds, on half-time the iteration took ~7 minutes. While the execution time of each step approximately constant, the time between ending a step and starting the next one increased from 500 ms to 11 seconds!! 
A memory issue?
Did anyone experience similar behaviour?
Require code? Please let me know!
Thank you very much in advance for your help!!
Penny_Wise
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules